What's new

June 2018

  • Commissioning supplement for SL G3 series boilers with side piping (SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, SL 30-199 G3). See also the Commissioning section of the Installation and Operating Instructions manual.
  • Supplement for V-10 controller BACnet
  • Updated the Installation and Operating instructions for the SL 26-260 G3 and the SL 40-399 G3 manual (release 5 - English version)
  • Updated the Installation and Operating instructions for the SL 26-260 G3 and the SL 40-399 G3 manual (release 5 - French version)
  • Troubleshooting LWCO/High Limit Switch errors in SL G1 & G2 boilers
  • Download models of the SL 40-399 G3 and SL 26-260 G3 boilers in new 2D/3D formats: Revit RFA and RVT (Revit 2019), DXF, DWG and SKP
  • Residential concept drawing: Four-load system with indirect domestic hot water receiving priority operation, low-temperature space heating, spa and pool heat exchangers.

New 2D/3D formats

SL 40-399 G3, SL 26-260 G3: .rfa, .rvt, .skp, . dwg, .dxf


Concept Drawing

Residential SL G3 boilers: 4-load with indirect DHW